Mitcham: total bathroom redesign

Mitcham: total bathroom redesign

For this six-day project, an existing damp problem needed to be remedied and a suitable ventilation system installed to prevent the damp from recurring. We then removed and replaced the wall tiles, removed and replaced the bathroom furniture, laid new tile flooring and disposed of old units and fittings